項(xiàng)目名稱 Project |
產(chǎn)品種類 Product |
產(chǎn)品規(guī)模 Scale and Capacity |
服務(wù)范圍 Service Scope |
投產(chǎn)日期 Start-up |
A |
Pulp & Paper Industry |
|
|
|
|
1 |
貴州鵬昇(集團(tuán))紙業(yè)有限責(zé)任公司年產(chǎn)60萬(wàn)噸包裝紙建設(shè)項(xiàng)目The New Mill of 600,000t/a Package Board, Guizhou Pengsheng Group |
PM1:高強(qiáng)瓦楞紙(Corrugated medium) PM2:箱板紙 (Kraft liner) |
PM1: 320,000t/a PM2: 230,000t/a |
Completely EPC and turn-key |
PM1:20181230 PM2:20190331 |
2 |
四川金田紙業(yè)有限公司二期工程Sichuan Jintian Base,Phase 2 |
高強(qiáng)瓦楞紙 ( Corrugated paper) |
年產(chǎn)20萬(wàn)噸 200,000t/a |
EPC總承包 |
2017.11 |
3 |
貴州赤天化紙業(yè)股份有限公司清水工程Fresh Water Intake and Pumping Station, Chitianhua Company, Guizhou |
|
3萬(wàn)M3清水/天 Fresh water 30,000m3/d |
總包 EPC(Include Engineering, Procurement, Construction) |
2016.10 |
4 |
歐米亞(北海)年產(chǎn)5萬(wàn)噸GCC總承包工程EPC Project of 50,000 TPA GCC, Omya (Beihai) |
年產(chǎn)5萬(wàn)噸碳酸鈣 (GCC 50,000t/a) |
|
總包 EPC(Include Engineering, Procurement, Construction) |
2016.12 |
5 |
歐米亞(常熟)年產(chǎn)6萬(wàn)噸GCC總承包工程EPC Project of 60,000 TPA GCC, Omya (Changshu) |
年產(chǎn)6萬(wàn)噸碳酸鈣 (GCC 60,000t/a) |
|
總包 EPC(Include Engineering, Procurement, Construction) |
2017.04 |
6 |
泰國(guó)PPPC苛化改造項(xiàng)目總包工程 Rebuilt of Causticizing System,PPPC group |
|
|
總包 EPS(Include Engineering, Procurement, Supervision) |
2016.12 |
7 |
泰國(guó)PPPC石灰窯項(xiàng)目總包工程N(yùn)ew Lime Kiln System of PPPC Group |
|
|
總包 EPS(Include Engineering, Procurement, Supervision) |
2017.20 |
8 |
加拿大How sound工廠漿系統(tǒng)改造工程 Pulp Line Rebuilt of How Sound Pulp & Paper Mill, Canada |
加拿大PE公司How sound漿廠O2D&VE改造管道預(yù)制項(xiàng)目Canadian PE company How sound pulp mill O2D&VE upgrading pipeline prefabrication project |
450,000 t/a pulp line |
總包 EPS(Include Engineering, Procurement, Supervision) |
2016.08 |
9 |
伊朗里海造紙項(xiàng)目 RASHA CASPIAN IRANIAN PAPER INDUSTRY |
箱紙板 (Kraft liner board ) |
20萬(wàn)噸/年牛皮箱紙板 Kraft liner board: 200,000t/y |
總包 EPS(Include Engineering, Procurement, Supervision of Construction & Commissioning) |
2016.1 |
10 |
浙江傳承實(shí)業(yè)有限公司50萬(wàn)噸包裝紙工程 500,000 t/a Packaging Paper Project of Chuancheng, Yongtai group, Zhejiang Province |
箱紙板,瓦楞紙 (Kraft liner board & Corrugated paper) |
30萬(wàn)噸/年牛皮箱紙板,20萬(wàn)噸/年瓦楞紙 Kraft liner board: 300, 000 t/a, Corrugated paper : 200,000 t/a |
總包 EPC(Include Engineering,Procurement, Construction, Commissioning) |
2016.12 |
11 |
江門星輝造紙有限公司年產(chǎn)30萬(wàn)噸白板紙工程Jiangmen XingHui Paper Co.,Ltd, 300,000 TPA Coated White Cardboard |
涂布白板紙 (Coated white cardboard) |
30萬(wàn)噸/年, 300,000 t/a coated white cardboard |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.07 國(guó)家總承包銅鑰匙獎(jiǎng) Bronze Key of National EPC Prize |
12 |
四川宜賓紙業(yè)有限公司搬遷工程 Relocation Project of Yibin Paper Co., Ltd, China |
涂布白卡紙 (Coated white cardboard) |
食品卡紙 800t/d, 電站:1×40MW+1×12MW Food card board: 800t/d, Power station: 1×40MW+1×12MW |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.12 |
13 |
浙江景興紙業(yè)股份有限公司PM16年產(chǎn)30萬(wàn)噸高瓦紙項(xiàng)目Jingxing Paper Co., Ltd , Zhejiang, China |
高強(qiáng)瓦楞紙 (Corrugated paper) |
30萬(wàn)噸/年, 300,000t/a |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.10 |
14 |
浙江景興紙業(yè)股份有限公司PM12改造項(xiàng)目 PM12 Rebuilld Project of Jingxing Paper Co., Ltd, Zhejiang, China |
Kraft liner |
5,600mm,1,100m/min |
EPC |
2016.12 |
15 |
四川華僑鳳凰紙業(yè)有限責(zé)任公司新增15萬(wàn)噸高檔涂布白板紙技改工程N(yùn)ew 150,000 t/a High-quality Coated White Board Technical Upgrading Project of Sichuan Huaqiao Fenghuang Paper Co., Ltd, China |
涂布白板紙 (Coated white cardboard) |
涂布白卡紙450t/d,電站1×15MW Coated white cardboard: 450t/d, Power station: 1×15MW |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2011.12 |
16 |
福建青山紙業(yè)公司制漿系統(tǒng)技改工程 Pulping Line Upgrading, Fujian Qingshan Paper Co., Ltd |
化學(xué)溶解漿 (Chemical dissolving pulp) |
120,000 t/a dissolving pulp board |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2011.12 Bronze Key of the 6th session of National EPC Prize |
17 |
緬甸YENI制漿造紙工程YENI Pulp & Paper Project, Myanmar |
化學(xué)漿,堿回收 (Chemical pulp & alkali recovery) |
水泥袋紙生產(chǎn)線,堿回收,熱電站 Kraft sack paper line,alkali recovery,Power station |
Technical Contractor |
2009.1 Golden Key of the 5th session of National EPC Prize |
18 |
緬甸YENI制漿造紙工程YENI Pulp & Paper Project, Myanma |
化機(jī)漿( Chemical and mechanical pulp) |
化機(jī)漿板生產(chǎn)線, Chemical and mechanical pulp line |
Technical Contractor |
2009.1 Golden Key of the 6th session of National EPC Prize |
19 |
湖南湘豐紙業(yè)公司Hunan Xiangfeng Paper Co., Ltd, China |
特種紙 (Special paper) |
8,000t/a,Cigarette prodution line |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning,Training) |
2008.08 Bronze Key of the 5th session of National EPC Prize(國(guó)家銅鑰匙獎(jiǎng)) |
20 |
駐馬店市白云紙業(yè)有限公司年產(chǎn)20.4萬(wàn)噸高檔文化紙項(xiàng)目制漿ECF技改工程204,000t/a High Grade Printing Paper ECF Technical Reform Project of Baiyun Paper |
|
制漿ECF技改,ECF Technical Reform |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2013.08 |
21 |
云南云景林紙股份有限公司1#抄漿精選系統(tǒng)改造 Technical Reform for Yunnan Yunjing Forest and Paper Co., Ltd. |
|
|
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.03 |
22 |
APP寧波項(xiàng)目曖通工程HVAC Division for APP in Ningbo PM6 |
|
HVAC for paper machine plant |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.10 |
B |
Power Plant & Environmental Engineering |
|
|
|
|
1 |
正隆越南汽電廠BOP工程Zhenglong Vietnam Power Plant BOP Project |
|
1x130T/h循環(huán)流化床鍋爐及1x30MW抽凝汽輪發(fā)電機(jī)及其配套 1x130T/h circulating fluidized bed boiler and 1x30MW pumping condensing turbine generator and its supporting |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2018.20 |
2 |
海南金海漿紙業(yè)有限公司MB6室外備料系統(tǒng)EPC Project of MB6 External Multi-fuel Mixing & Conveying System of APP Jinhai |
|
生物質(zhì)1800t/d,污泥1030t/d Capacity: Biomass 1,800t/d, Sludge 1,030t/d |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.02 |
3 |
海南金海漿紙業(yè)有限公司MB6室內(nèi)備料系統(tǒng)EPC Project of MB6 Internal Multi-fuel Mixing & Conveying System of APP Jinhai |
|
生物質(zhì)1800t/d,污泥1030t/d Capacity: Biomass 1,800t/d, Sludge 1,030t/d |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.01 |
4 |
廣東鼎豐熱電廠新建工程Thermal Power Plant of Guangdong Dingfeng Paper(Yuen Foong Yu Group Taiwan) |
|
1x90TPH 多燃料鍋爐+1x12MW抽汽背壓機(jī)組 1x90TPH multi-fuel boiler+1xCB12MW TG unit |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.02 |
5 |
印尼占碑TG28 EPC工程LPPPI TG28, Jambi, Indonesia |
|
TG28 CC60MW and its complete system |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2015.07 |
6 |
印尼占碑TG29 EPC工程LPPPI TG29, Jambi, Indonesia |
|
TG29 B2.55MW and its complete system |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2015.07 |
7 |
印尼廖省 IKPP MB24 670t/h鍋爐多種燃料配料喂料系統(tǒng)技改工程Multi-fuel Feeding System for MB24 670t/h IKPP Riau, Indonesia |
|
MB24 670t/h鍋爐多種燃料配料喂料系統(tǒng) Multi-fuel Feeding System for MB24 670t/h Fuel: coal, waste(bark) |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.11 |
8 |
印尼廖省 IKPP MB25 670t/h鍋爐多種燃料配料喂料系統(tǒng)技改工程Multi-fuel Feeding System for MB25 670t/h IKPP Riau, Indonesia |
|
MB25 670t/h鍋爐多種燃料配料喂料系統(tǒng) Multi-fuel Feeding System for MB25 670t/h Fuel: coal, waste(bark) |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.11 |
9 |
上海太平洋化工(集團(tuán))淮安元明粉有限公司能量系統(tǒng)優(yōu)化技改項(xiàng)目Optimization and Technological Upgrading Project of Power System for Shanghai Pacific Chemical (Group) Hua'an Anhydrous Sodium Sulphate Co., Ltd. |
|
1x75t/hCFB+1xB7MW Fuel: coal |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2014.03 |
10 |
焦作瑞豐有限公司生物質(zhì)廢棄物焚燒供熱系統(tǒng)工程 Waste and Biomass Incineration and Heat Supplying Project of Jiaozuo |
|
1x25t/h and its complete system Fuel: coal, waste(bark, wood chips, gas and sludge) |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning,Training) |
2011.03 |
11 |
貴州博宏小河金屬鑄業(yè)公司450m3高爐煤氣 發(fā)電改造工程450m3 Blast Furnace Gas Generation Reconstruction Project of Guizhou Bohong Xiaohe Metal Casting Co., Ltd |
|
1×N6MW+450m3 Fuel: Gas |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2010.04 |
12 |
四川鳳凰有限公司熱電站Thermal Power Plant of Sichuan Phoenix |
|
2×75t/h+1×C15MW, 次高溫次高壓參數(shù)(5.3MPa/485℃) 2×75t/h +1×C15MW; steam is of sub-high temperature sub-high pressure (5.3MPa/485℃). |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2011.05 |
13 |
孟加拉22座變電站工程22 Substations in Bangladesh |
區(qū)域變電站Regional substations |
|
交鑰匙工程 TURN-KEY |
2018.12 |
C |
Evaporative Crystallization Industry |
|
|
|
|
1 |
南通經(jīng)濟(jì)開發(fā)區(qū)中水回用示范一期工程 Reclaimed Water Reuse First-Stage Project of Nantong Economic and Technological Development Zone |
|
含鹽廢水Salt-containing wastewater, 預(yù)處理+膜處理+MVR Pretreatment+membrane treatment + MVR, 40,000m3/d |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning,Training) |
2014.03 國(guó)家總承包銀鑰匙獎(jiǎng) Silver Key of National EPC Prize |
2 |
南通經(jīng)濟(jì)開發(fā)區(qū)中水回用示范二期工程 Reclaimed Water Reuse Second-Stage Project of Nantong Economic and Technological Development Zone |
|
含鹽廢水Salt-containing wastewater, 預(yù)處理+膜處理+MVR Pretreatment+membrane treatment + MVR, 17,500m3/d |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning,Training) |
2015.01 國(guó)家總承包銀鑰匙獎(jiǎng) Silver Key of National EPC Prize |
3 |
唐山匯鑫嘉德節(jié)能減排科技股份有限公司燒結(jié)煙塵綜合利用項(xiàng)目Sintered Smoke Dust Comprehensive Utilization Project for Tangshan HXJD Energy Saving and Emission Reduction Technology Co., LTD |
|
氯化鉀Potassium chloride, 預(yù)處理+多效蒸發(fā) Pretreatment + Multiple-effect evaporation |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2012.09 |
4 |
江蘇海門容匯鋰業(yè)有限公司硫酸鈉廢水處理工程Sodium Sulfate Wastewater Treatment Project of Jiangsu Haimen Ronghui Lithium Industry Co., LTD |
|
硫酸鈉Sodium sulfate, 多效蒸發(fā)Multiple-effect evaporation |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2010.08 |
5 |
錫林郭勒盟額吉淖爾鹽場(chǎng)綜合技術(shù)改造項(xiàng)目Comprehensive Technical Upgrading Project of XLGLMEJNEYC |
|
氯化鈉 Sodium chloride, 五效蒸發(fā) Five-effect evaporation |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2015.06 |
6 |
衢州華友鈷新材料有限公司10萬(wàn)噸/年硫酸銨廢水資源化綜合回用項(xiàng)目100,000 t/a Ammonium Sulfate Wastewater Resource Comprehensive Recycling Project for Quzhou Huayou Cobalt New Material Co., LTD |
|
含鹽廢水Salt-containing wastewater, 前處理+MVR, Pretreatment + MVR |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.01 |
7 |
印尼UCI制鹽工程Salt Production Project for Indonesia UCI |
|
氯化鈉Sodium chloride,MVR |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.03 |
8 |
天津市茂聯(lián)科技有限公司茂聯(lián)科技工業(yè)污水處理項(xiàng)目施工總承包工程 Maolian Technology Industrial Wastewater Treatment EPC of Tianjin Maolian Technology Co., Ltd. |
|
|
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.9 |
9 |
西藏容匯鋰業(yè)科技有限公司5000噸/年磷酸鐵鋰工程廢水處理裝置 5,000 t/y Lithium Iron Phosphate Wastewater Treatment Equipment for Tibet Ronghui Lithium Technology Co., Ltd. |
|
|
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.8 |
10 |
大連新春多品種鹽有限公司30000噸/年MVR精制海鹽燒鹽項(xiàng)目30,000 t/y MVR Refined Salt Project for Dalian Xinchun Variety Salt Co., Ltd. |
|
年產(chǎn)3萬(wàn)噸精制鹽30,000 TPA refined salt |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2016.12 |
11 |
孟加拉制鹽工程Salt Production Project of Bangladesh |
|
氯化鈉Sodium chloride,MVR |
總包 EPC(Include Engineering, Procurement, Construction,Commissioning) |
2017.06 |
D |
Intelligent Equipment Manufacturing |
|
|
|
|
1 |
中國(guó)造紙裝備有限公司造紙裝備自主化創(chuàng)新集成示范基地項(xiàng)目 期工程 The 1st phase of Independent Innovation and Integration Base (Yongqing) for China Paper Equipment Corporation |
投資規(guī)模6.25億人民幣 Investment 625 million RMB |
|
總包 EPC(Include Engineering, Procurement, Construction) |
2012.12 |
2 |
長(zhǎng)沙長(zhǎng)泰機(jī)械股份有限公司智能制造裝備產(chǎn)業(yè)升級(jí)技術(shù)改造項(xiàng)目Changsha Chaint Machinery co., LTD. Intelligent Manufacturing Equipment Industry Upgrading Technology Renovation Project |
投資規(guī)模1億人民幣 Investment 100 million RMB |
|
總包 EPC(Include Engineering, Procurement, Construction) |
2015.12 |
3 |
長(zhǎng)沙長(zhǎng)泰機(jī)械股份有限公司機(jī)器人項(xiàng)目Changsha Chaint Machinery co., LTD. Robot Project |
投資規(guī)模1億人民幣 Investment 100 million RMB |
|
總包 EPC(Include Engineering, Procurement, Construction) |
2016.11 |
E |
Chemical Industry |
|
|
|
|
1 |
埃塞俄比亞EFFORT集團(tuán)年產(chǎn)6萬(wàn)噸PVC工廠交鑰匙工程EFFORT 60,000 TPA Integrated PVC Resin Manufacturing Plant Turnkey Project in Ethiopia |
投資規(guī)模13億人民幣 Investment 210 million USD |
年產(chǎn)6萬(wàn)噸PVC 60,000t/a PVC |
總包 EPC(Include Engineering, Procurement, Construction) |
2018.12 |